top of page

Order of cost estimates, cost plans and pre-tender estimates

Schemes we have cost planned, assessing and controlling the cost through the design stages to tender. The schemes below run from £4.99m to £56.32m of development cost. Click Read more on any scheme for the full detail.

£24.92m

HOTEL REFURBISHMENT AND EXTENSION

Colliers Wood, London

Extension, refurbishment and re-branding of a 156-key hotel to 204 keys.

£4.99m

LISTED BUILDING CONVERSION

Dean Farm, Jordans

A part 16th-century farm group, all Grade II listed, refurbished and extended into a single private residence.

£10m

NEW BUILD HOUSES

De Rougemont Manor, Brentwood

Redevelopment of the former De Rougemont Manor hotel site: fifteen new houses, a purpose-built block of six apartments, and four maisonettes converted from the existing stable block.

£6.67m

CONVERSION AND EXTENSION

Emerald House, West Byfleet

33 apartments from the conversion and extension of Emerald House, a former office building on High Road.

£24.5m

CONVERSION AND NEW BUILD

Devizes, Wiltshire

101 homes, a community workshop and a retail unit on the site of the former Wadworth's Brewery.

£9.99m

LISTED BUILDING CONVERSION

Twyford Abbey, London

Conversion of the Grade II listed Twyford Abbey, on the Historic England At Risk Register, to 30 private apartments, with one new-build unit in the grounds.

£56.32m

NEW BUILD APARTMENTS

Croydon, London (Vista)

199 apartments in two blocks up to 27 storeys over a shared entrance lobby, with a health centre at ground floor.

£7.08m

NEW BUILD STUDENT ACCOMMODATION

Paddington Packet Boat, Uxbridge

Demolition of a public house and a new-build block of purpose-built student accommodation on the corner of High Road and Packet Boat Lane, cost planned in 2023 and again in 2025 as the scheme grew.

Order of Cost Estimates, Cost Plans and Pre-Tender Estimates from concept design through to tender, for developers and housebuilders.

bottom of page