Twyford Abbey, London

£9.99m

LISTED BUILDING CONVERSION

Conversion of the Grade II listed Twyford Abbey, on the Historic England At Risk Register, to 30 private apartments, with one new-build unit in the grounds.

Click any thumbnail to enlarge. Drawings courtesy of Allford Hall Monaghan Morris.

30

UNITS

3,700

SQM GIFA

Residential

SCHEME CATEGORY

3 to 4

RIBA STAGE

Feb 2024 & Mar 2025

ESTIMATE DATE

Overview

Twyford Abbey is a Grade II listed early nineteenth century house in the London Borough of Ealing, arranged around a central courtyard and standing in grounds of around 5.4 hectares. It had been empty for years and sits on the Historic England At Risk Register at Category A, the highest category of risk. The scheme brings it back into residential use as 30 private apartments.

Twenty nine of the apartments are formed within the existing building. The work includes demolition of the 1960s infill to the west elevation and the 1960s east extension, a new full height link building, a mezzanine and partitions to form an apartment within the Chapel, two new lifts, a dormer extension to the 1904 range, new balconies to the courtyard elevations and ground floor terraces to the south and east. The external fabric, the Atkinson's cement render, the windows, the doors and the roofs are comprehensively repaired, the castellations are reinstated and the historic decoration to the entrance hall, the south rooms and the principal stair is put back.

The thirtieth unit is a new build. The existing workshop adjoining the Walled Garden is demolished and replaced with a single storey two bedroom house of 79 square metres. The separately listed Walled Garden and the Cottage are retained.

QSetc Role

Role Cost Planner

Date February 2025 & March 2025

Project Team

Client PPD3 Limited

Cost Planner QSetc

Architect Allford Hall Monaghan Morris

What we did

QSetc prepared Cost Plan 1 in February 2024 from early design information, before any fit out design was available, and the Pre-Tender Estimate in March 2025 as the design developed. The fit out design is still developing, and stripping the building back has shown that more steel is needed within the building than first anticipated. Our work covers the Abbey and the Workshop, which sit within a wider consented redevelopment of the whole site.