top of page

Canterbury, Kent

£9.88m

NEW BUILD HOUSES

34 new houses on the former Chaucer School site, across five house types at two and two and a half storeys.

Click any thumbnail to enlarge. Drawings courtesy of Hollaway.

34

UNITS

3,237

SQM GIFA

Residential

SCHEME CATEGORY

2 to 3

RIBA STAGE

Oct 2025

ESTIMATE DATE

Overview

This scheme is the redevelopment of the former Chaucer School on Spring Lane for 34 houses, arranged in two rows around an internal street with off-road parking and three shared carports at the entrance. The mix is six two bedroom and 28 three bedroom homes, at two and two and a half storeys, with the upper floor of the taller homes held within the roof space.

Gross internal floor area is 3,237 sqm. Air source heat pumps and MVHR are allowed to every plot, together with EV charging.

The site is the first phase of a wider council allocation for up to 70 homes.

QSetc Role

Role Indicative Cost Estimator

Date October 2025

Project Team

Client Galliard Homes (GHL Canterbury Ltd)

Indicative Cost Estimator QSetc

Architect Hollaway

Planning DHA Consultants

What we did

QSetc prepared an Indicative Cost Estimate in October 2025 from the architect's drawings and area schedule.

Weighing up a site?

Tell us about your scheme and we will advise which estimate fits. Indicative fee range within 24 hours.

bottom of page